Digital Project


Some support for this task

Start by looking at the JK Flip Flop and how this can improve the method of control. The pump at the moment after stage one is on-off control and a small demand will see th epump coming on and off continuously causing pproblems and inefficiencies


Stage 3 
This introduces the stage three part to include a four level lift controller, now we are starting to think logically. This is all in preparation for the lfit model and programming a PLC (Programmable logic controller)